Creating an order
Create a draft import deal in four steps. Pick a supplier, describe the goods, add shipping costs and review.
What it is
A deal is one import order with one supplier. The Deals page lists your deals. New deal opens a four-step form that creates a draft deal. Creating a draft moves no money.
Who uses it
Buyer Buyers create deals. Admins can too. Suppliers and judges do not see the New deal button.
When to use it
When you agree to buy goods and want to track cost, milestones and escrow in one place.
Step by step
Open Deals and find your deal
Open Deals in the menu. Filter by status (All, Draft, Proposed, Confirmed, Funded, In production, Shipped, Arrived, Completed, Disputed, Cancelled) or search by reference, goods or supplier. Click New deal. If you have no deals yet, the button is called Create a deal.
The Deals list with filters and the New deal button. Step 1 - Supplier
Choose one supplier. Each has a supplier-check badge (KYB, which means Know Your Business). If the badge is Warning or Blocked, a dialog asks you to confirm with Use this supplier anyway. Paying a blocked supplier is strongly discouraged and the system may refuse it later.
Step 1: choose a supplier. Step 2 - Goods
Fill in Goods, HS code (4 to 12 digits and dots, for example 6109.10), Quantity, Unit, Unit price and Input currency (USD or CNY). Expected sale value is optional. The Goods total is a preview. The system calculates the final value.
Step 2: describe the goods. Step 3 - Shipping and costs
Pick the Incoterm (for example FOB), the Port of loading and Port of discharge. Add optional extra costs: freight, insurance, duty and taxes, bank charges. A Landed cost preview appears with the total and the cost per unit.
Step 3: shipping, extra costs and the landed cost preview. Step 4 - Review and create
Check the summary. Click Create draft deal. You land on the new deal page with a reference such as SETU-2026-0001.
Step 4: review and create the draft.
What the results mean
| Item | Meaning |
|---|---|
| Draft | The deal exists but has no payment schedule yet. |
| Landed cost preview | Total cost to land the goods, and per unit. Calculated by the system, simulated. |
| Supplier badge | Result of the supplier check. See Suppliers and KYB. |
After creation you propose milestones, both sides confirm, then you fund the escrow. See Deal detail.
Tips and common mistakes
- Use a period for decimals. Quantity and unit price must be above zero.
- The landed cost preview can be unavailable. You can still create the deal.
- If creation fails, the red message at the bottom of the review step says why. Nothing is saved.